CASE STUDY

Preventing Build-Up in Process Heat Exchangers

Rented and temporarily installed a water softener from a local company to test the viability of producing emulsion using soft water, with the final goal of preventing build-up in process heat exchangers.

Burlington, ON

Manufacturing

Burlington, ON

Manufacturing

The Project

Rented and temporarily installed a water softener from a local company to test the viability of producing emulsion using soft water, with the final goal of preventing build-up in process heat exchangers.

Project Costs

~$70,000 in Total Cost

Payback Period

~2 years in Payback Period

Sustainability Highlights

Reduced Carbon Emissions

18,250 m3/year in Natural Gas Reductions

Reduced Operating Costs

$43,000/year in Cost Savings

Reduced Water Consumption

7,000 m3/year in Water Savings

The Benefits

Reduced Carbon Emissions

Reduced Water Consumption

Green Economy Canada’s National Hub provides a cost-effective, practical, and hands-on approach to help organizations across Canada take action on climate change and build sustainability into their operations. We provide training, resources, and 1:1 support to help our members measure and reduce their carbon footprint while saving money, building their brand, and becoming the supplier and employer of choice. Join us in making business better, together. Contact us at info@greeneconomy.ca or visit our website at greeneconomy.ca to learn more.

Become a Member

Join our network to get started on your organization’s sustainability journey.